CCM Engineering has been appointed by SIAD for the supply of no.2 tube bundles in Copper (SB-111 C12200).
After successful test both equipments will replace the damaged existing units in a Gas Treatment Plant.
CCM Engineering has been appointed by SIAD for the supply of no.2 tube bundles in Copper (SB-111 C12200).
After successful test both equipments will replace the damaged existing units in a Gas Treatment Plant.